Image from Google Jackets

Environmental assessment guidelines for power transmission line projects /

By: Material type: TextTextPublication details: Thimphu : National Environment Commission. May 2012.Description: 33 p. : 19 cmSubject(s): DDC classification:
  • 333.7 NEC
Item type: Environment
Tags from this library: No tags from this library for this title.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Status Barcode
College of Natural Resources 333.7 NEC (Browse shelf(Opens below)) Available D2180
College of Natural Resources 333.7 NEC (Browse shelf(Opens below)) Available D2181
College of Natural Resources 333.7 NEC (Browse shelf(Opens below)) Available D2182
College of Natural Resources 333.7 NEC (Browse shelf(Opens below)) Available D2183
College of Natural Resources 333.7 NEC (Browse shelf(Opens below)) Available D2184

There are no comments on this title.

to post a comment.
Share

College of Natural Resources, Royal University of Bhutan | ©
Office: +975 02 376247 (Ext. 2004), E-mail: library.cnr@rub.edu.bt