Estimatingf the magnitude of the probable maximum flood (PMF) on the spillway capacity of the Punatsangchhu-I hydropower plant dam using the multi-model esnemble of NEX-GDDP CMIP6 climate projections under SSP2-4.5 and SSP5-8.5 scenarios /
Material type:
- Thesis/ECS/AMA 8th Coh.

Current library | Call number | Status | Barcode | |
---|---|---|---|---|
College of Natural Resources | Thesis/ECS/AMA 8th Coh. (Browse shelf(Opens below)) | Not for loan | T1249 |
Browsing College of Natural Resources shelves Close shelf browser (Hides shelf browser)
Includes abstracts and acknowledgment
There are no comments on this title.
Log in to your account to post a comment.